Planned and capital works

Cyclical and external decoration for social landlords

External painting and repairs on a cycle, protecting timber, render and metalwork before they fail.

Cyclical decoration is the routine repainting and associated repair of external timber, render, metalwork and communal internal areas, typically every few years, to protect the building fabric. The pre-paint repairs are often more valuable than the paint itself.

Cyclical and external decoration in a social home

How do we approach cyclical decoration?

We survey before we paint: rotten timber, failed putty, loose render and rusting metalwork are repaired first, then prepared and decorated. Where scaffold is needed, we look at gutters and roofs at the same time.

What is included?

  • Pre-paint survey and repairs to timber, render and metalwork
  • External decoration of windows, doors, fascias, soffits and render
  • Communal internal decoration of halls, stairs and landings
  • Metal railings, balustrades and gates
  • Gutter clearance during access
  • Resident notices and protection

What do we hand over at the end?

  • Pre-paint survey with repair items
  • Completion photographs
  • Paint system specification

Who is this service for?

  • Landlords with cyclical maintenance cycles
  • Leasehold blocks where costs are recharged
  • Estate teams

Process

How does each job run?

  1. Pre-paint survey

    Each block or house is inspected and repairs are priced before decoration.

  2. Repairs

    Timber, render and metal repairs completed first.

  3. Decoration

    Prepared and painted to your specification and colour scheme.

  4. Sign-off

    Completion photos and a note of defects outside scope.

Rules by nation

Which rules shape cyclical decoration in each UK nation?

The legal duties sit with the landlord. These are the rules that set the timescales and standards we work to, as checked on 31 October 2026.

England

Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor. A project must be notified to HSE if it lasts more than 30 working days with more than 20 workers on site at once, or exceeds 500 person-days.

Where costs are recharged to leaseholders, landlords in England and Wales may need to consult under section 20 of the Landlord and Tenant Act 1985 before qualifying works start. We provide itemised costs per block to support that.

Decent Homes Standard (England)
Wales

Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor. A project must be notified to HSE if it lasts more than 30 working days with more than 20 workers on site at once, or exceeds 500 person-days.

Where costs are recharged to leaseholders, section 20 consultation may be needed before qualifying works start. We provide itemised costs per block to support that.

WHQS 2023 (Wales)
Scotland

Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor. A project must be notified to HSE if it lasts more than 30 working days with more than 20 workers on site at once, or exceeds 500 person-days.

Owners in mixed-tenure blocks share common repair costs under their title deeds and the Tenement Management Scheme. We provide itemised costs per block.

SHQS (Scotland)
Northern Ireland

Northern Ireland has its own construction safety rules, the Construction (Design and Management) Regulations (Northern Ireland) 2016, enforced by HSENI. Social landlords carrying out works are commercial clients with duties under them.

Where owners in a block share costs, their leases or deeds set the process. We provide itemised costs per block.

Decent Homes Standard (NI)

Guide prices

What does cyclical decoration cost?

Rounded planning figures with their sources and VAT basis. Your price depends on the survey, your specification and the region. Use our programme budget tool for a regional estimate.

ItemUnitGuide rangeBasis
External redecorationper house£800–£3,600Published figure: Consumer guide: terraced £800–£1,600, semi-detached £1,800–£3,600 (Checkatrade, 2025–26). No social housing programme rate was found. VAT basis: unclear.

Prices checked 31 October 2026. See all guide prices and regional factors.

Questions

Cyclical and external decoration: common questions

How often should cyclical decoration happen?

Most landlords work on a cycle of roughly five to seven years for external work, but it depends on exposure and materials. Your stock condition data should set the cycle.

Do you repair before painting?

Always. Painting over rot or failed render hides the problem for a year and makes it worse.

Can costs be recharged to leaseholders?

Your leases decide that. We provide itemised costs per block to support any consultation you need to carry out.

Talk to us

Need cyclical decoration capacity?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote