Supported and sheltered housing refurbishment · East Midlands
Supported and sheltered housing refurbishment in High Peak
Works in supported housing in High Peak need careful planning with scheme managers and support providers. That planning is part of our service.
Social landlords in High Peak can appoint us for supported and sheltered housing refurbishment, from a single home to a programme. High Peak Borough Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
High Peak at a glance
- Council
- High Peak Borough Council
- Region
- East Midlands
- County
- Derbyshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 92,633 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in High Peak?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in High Peak?
- Flat refurbishment between and during tenancies
- Communal lounges, kitchens and laundries
- Corridors, handrails, flooring and lighting for accessibility
- Fire safety items in communal areas
- Dementia-friendly finishes where specified

How do we deliver it?
Operatives are briefed on the setting, including how to behave around residents with dementia or other support needs.
Which rules apply in High Peak?
Under the Fire Safety (England) Regulations 2022, in residential buildings with storeys over 11 metres high, communal fire doors must be checked every three months and flat entrance doors every year on a best-endeavours basis. The Fire Safety Act 2021 confirmed that flat entrance doors fall under the Fire Safety Order.
Decent Homes Standard (England) · More about supported and sheltered housing refurbishment
What does supported and sheltered housing refurbishment cost in High Peak?
Our guide range for a major void in High Peak is £6,100–£15,300 per void. That is the UK range of £6,000–£15,000 (our estimate) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about supported and sheltered housing refurbishment in High Peak
Does High Peak Borough Council still own council homes?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on supported and sheltered housing refurbishment in High Peak as a subcontractor?
Yes. Main contractors working for social landlords in High Peak can engage us as a tier-2 subcontractor for supported and sheltered housing refurbishment, working under their systems and their client's specification.
Do you also work near High Peak?
Yes. We take on supported and sheltered housing refurbishment across the East Midlands, including Stockport, Tameside, Sheffield and Oldham, and in every other UK nation.
Other works we carry out in High Peak
- Damp and mould remediation
- Housing disrepair works
- Roofing and rainwater goods
- Cyclical and external decoration
- Planned maintenance and Decent Homes works
- Fire door installation and remediation
- Kitchen replacement programmes
- Aids and adaptations
- Fire stopping and compartmentation
- Bathroom replacement programmes
- Communal area refurbishment
- Electrical remedial works and rewires