Planned maintenance and Decent Homes works · East Midlands
Planned maintenance and Decent Homes works in High Peak
Keeping homes in High Peak at the standard that applies to them depends on renewing components before they fail. We programme and deliver that work.
Social landlords in High Peak can appoint us for planned maintenance works, from a single home to a programme. High Peak Borough Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
High Peak at a glance
- Council
- High Peak Borough Council
- Region
- East Midlands
- County
- Derbyshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 92,633 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in High Peak?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in High Peak?
- Validation surveys of homes in the programme
- Multi-trade packages: kitchens, bathrooms, windows, doors, roofs, electrics
- Programme reporting: starts, completions, variations and spend
- Updated component data returned for your asset system
- Coordination with your compliance contractors

How do we deliver it?
Programmes are planned street by street, so each resident sees one coordinated set of works rather than several contractors on different dates.
Which rules apply in High Peak?
Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.
Decent Homes Standard (England) · More about planned maintenance works
What do planned maintenance works cost in High Peak?
Our guide range for a kitchen in a replacement programme in High Peak is £5,100–£10,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about planned maintenance works in High Peak
Does High Peak Borough Council still own council homes?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Do you also work near High Peak?
Yes. We take on planned maintenance works across the East Midlands, including Stockport, Tameside, Sheffield and Oldham, and in every other UK nation.
Which housing standard applies in High Peak?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in High Peak
- Smoke, heat and CO alarm installation
- Fire door installation and remediation
- Estate and external works
- Bathroom replacement programmes
- Window and door replacement
- Supported and sheltered housing refurbishment
- External wall insulation
- Loft and cavity wall insulation
- Kitchen replacement programmes
- Void property works
- Fire stopping and compartmentation
- Whole-house retrofit