Planned maintenance and Decent Homes works · North West

Planned maintenance and Decent Homes works in Tameside

Keeping homes in Tameside at the standard that applies to them depends on renewing components before they fail. We programme and deliver that work.

Planned maintenance works in Tameside are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. Most social homes in Tameside belong to housing associations after the council transferred its stock.

Tameside at a glance

Council
Tameside Metropolitan Borough Council
Region
North West
Council homes
Transferred to housing associations
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
227,117 (2020 estimate)
Regional price factor
1.01 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Tameside?

Most social homes in Tameside are owned by housing associations, following the transfer of the council's homes to housing association ownership. Tameside Metropolitan Borough Council remains the strategic housing authority, with duties on homelessness and housing need.

What do we cover in Tameside?

  • Validation surveys of homes in the programme
  • Single-component programmes where you prefer separate streams
  • Resident liaison and choice management
  • Updated component data returned for your asset system
  • Coordination with your compliance contractors
Planned maintenance and Decent Homes works in a social home

How do we deliver it?

We start by checking the programme data against what our surveyors find, because ordering components for the wrong homes is the most expensive mistake in planned works.

Which rules apply in Tameside?

Since April 2024 the Regulator of Social Housing has inspected landlords with more than 1,000 homes against its consumer standards, on at least a four-year cycle. The Safety and Quality Standard expects an accurate, up-to-date and evidenced understanding of the condition of every home, based on physical assessment.

Decent Homes Standard (England) · More about planned maintenance works

What do planned maintenance works cost in Tameside?

Our guide range for a kitchen in a replacement programme in Tameside is £5,050–£10,100 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.01 (VOA Rating Cost Guide 2026: 1.01–1.02); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about planned maintenance works in Tameside

Does Tameside Metropolitan Borough Council still own council homes?

Most social homes in Tameside are owned by housing associations, following the transfer of the council's homes to housing association ownership. Tameside Metropolitan Borough Council remains the strategic housing authority, with duties on homelessness and housing need.

Which housing standard applies in Tameside?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.

Do you also work near Tameside?

Yes. We take on planned maintenance works across the North West, including Oldham, Stockport, Manchester and Rochdale, and in every other UK nation.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote