Fire stopping and compartmentation · East Midlands
Fire stopping and compartmentation in High Peak
Social landlords in High Peak can use us to close out fire risk assessment actions on compartmentation and fire stopping.
Social landlords in High Peak can appoint us for fire stopping and compartmentation works, from a single home to a programme. High Peak Borough Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
High Peak at a glance
- Council
- High Peak Borough Council
- Region
- East Midlands
- County
- Derbyshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 92,633 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in High Peak?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in High Peak?
- Compartmentation surveys of risers, ceiling voids and roof spaces
- Sealing service penetrations with tested systems
- Cavity barriers and fire-rated batt systems
- Fire-rated boarding and ceiling repairs
- Penetration logs with photographs and product references

How do we deliver it?
Each penetration is numbered, photographed before and after, and logged with the product used, so your building safety case has evidence rather than assurances.
Which rules apply in High Peak?
Under the Building Safety Act 2022, building work in higher-risk buildings (18 metres or 7 storeys and above, with at least two homes) needs Building Safety Regulator approval before it starts unless it is exempt; most repairs and like-for-like replacements are exempt, but heating systems, fuse boxes and glazing units are not. Approval can take up to eight weeks for existing buildings, so we build it into the programme.
Decent Homes Standard (England) · More about fire stopping and compartmentation works
What do fire stopping and compartmentation works cost in High Peak?
We price fire stopping and compartmentation works in High Peak after a survey rather than from a guide range, because the number and type of penetrations, access to risers and voids, and building height vary from block to block. Send us the details and we will arrange a visit.
Questions about fire stopping and compartmentation works in High Peak
Does High Peak Borough Council still own council homes?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in High Peak?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on fire stopping and compartmentation works in High Peak as a subcontractor?
Yes. Main contractors working for social landlords in High Peak can engage us as a tier-2 subcontractor for fire stopping and compartmentation works, working under their systems and their client's specification.
Other works we carry out in High Peak
- Aids and adaptations
- Damp and mould remediation
- Whole-house retrofit
- Window and door replacement
- Electrical remedial works and rewires
- Bathroom replacement programmes
- Planned maintenance and Decent Homes works
- Kitchen replacement programmes
- Fire door installation and remediation
- Responsive repairs
- Communal area refurbishment
- Smoke, heat and CO alarm installation