Aids and adaptations · East Midlands
Aids and adaptations in High Peak
If you have a list of adaptations waiting in High Peak, we can price them in the format your funding route requires and work through them.
Social landlords in High Peak can appoint us for aids and adaptations, from a single home to a programme. High Peak Borough Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
High Peak at a glance
- Council
- High Peak Borough Council
- Region
- East Midlands
- County
- Derbyshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 92,633 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in High Peak?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in High Peak?
- Level-access showers and wet rooms
- Stairlifts and through-floor lifts, coordinated with specialist suppliers
- Door widening and threshold removal
- Kitchen adaptations at accessible heights
- Ground-floor bedroom and shower room extensions

How do we deliver it?
Where possible, we hand over with the occupational therapist present, so any adjustment can be agreed on the spot.
Which rules apply in High Peak?
Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.
Decent Homes Standard (England) · More about aids and adaptations
What do aids and adaptations cost in High Peak?
Our guide range for a level-access shower or wet room in High Peak is £4,850–£6,650 per home. That is the UK range of £4,750–£6,500 (published figure) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about aids and adaptations in High Peak
Does High Peak Borough Council still own council homes?
High Peak Borough Council still owns council homes in High Peak and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in High Peak?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Do you also work near High Peak?
Yes. We take on aids and adaptations across the East Midlands, including Stockport, Tameside, Sheffield and Oldham, and in every other UK nation.
Other works we carry out in High Peak
- Cyclical and external decoration
- Heating upgrades and heat pumps
- Responsive repairs
- Electrical remedial works and rewires
- Damp and mould remediation
- Fire door installation and remediation
- Void property works
- Window and door replacement
- Whole-house retrofit
- Loft and cavity wall insulation
- Brickwork, pointing and render repairs
- Housing disrepair works