Whole-house retrofit · London
Whole-house retrofit in Bromley
Social landlords in Bromley can use us to deliver retrofit measures towards their EPC and net zero targets, with the evidence funders ask for.
Whole-house retrofit in Bromley is carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. Most social homes in Bromley belong to housing associations after the council transferred its stock.
Bromley at a glance
- Council
- London Borough of Bromley
- Region
- London
- Council homes
- Transferred to housing associations
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 332,752 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Bromley?
Most social homes in Bromley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bromley remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Bromley?
- Coordination with your retrofit assessor and retrofit coordinator
- Windows and doors, draught-proofing and airtightness details
- Ventilation upgrades to match the improved airtightness
- Heating: heat pumps, controls and emitters where specified
- Handover data for lodgement and post-installation evaluation

How do we deliver it?
We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.
Which rules apply in Bromley?
Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.
Decent Homes Standard (England) · More about whole-house retrofit
What does whole-house retrofit cost in Bromley?
Our guide range for whole-house retrofit towards EPC C in Bromley is £16,450–£28,800 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in Bromley
Does the London Borough of Bromley still own council homes?
Most social homes in Bromley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bromley remains the strategic housing authority, with duties on homelessness and housing need.
Do you also work near Bromley?
Yes. We take on whole-house retrofit across London, including Croydon, Lewisham, Greenwich and Bexley, and in every other UK nation.
Can you take on whole-house retrofit in Bromley as a subcontractor?
Yes. Main contractors working for social landlords in Bromley can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.
Other works we carry out in Bromley
- Window and door replacement
- Bathroom replacement programmes
- Planned maintenance and Decent Homes works
- Acquisition and temporary accommodation refurbishment
- Electrical remedial works and rewires
- Responsive repairs
- Cyclical and external decoration
- Loft and cavity wall insulation
- Fire stopping and compartmentation
- Aids and adaptations
- Supported and sheltered housing refurbishment
- Housing disrepair works