Supported and sheltered housing refurbishment · London
Supported and sheltered housing refurbishment in Bromley
Social landlords in Bromley can use us to refurbish flats, communal areas and accessible facilities in supported and sheltered schemes.
We take on supported and sheltered housing refurbishment in Bromley for housing associations (which own most social homes here) and supported housing providers, managing every trade ourselves and working to the timescales in your order. Most social homes in Bromley belong to housing associations after the council transferred its stock.
Bromley at a glance
- Council
- London Borough of Bromley
- Region
- London
- Council homes
- Transferred to housing associations
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 332,752 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Bromley?
Most social homes in Bromley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bromley remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Bromley?
- Flat refurbishment between and during tenancies
- Communal lounges, kitchens and laundries
- Corridors, handrails, flooring and lighting for accessibility
- Coordination with warden-call and alarm system providers
- Fire safety items in communal areas

How do we deliver it?
Operatives are briefed on the setting, including how to behave around residents with dementia or other support needs.
Which rules apply in Bromley?
Under the Fire Safety (England) Regulations 2022, in residential buildings with storeys over 11 metres high, communal fire doors must be checked every three months and flat entrance doors every year on a best-endeavours basis. The Fire Safety Act 2021 confirmed that flat entrance doors fall under the Fire Safety Order.
Decent Homes Standard (England) · More about supported and sheltered housing refurbishment
What does supported and sheltered housing refurbishment cost in Bromley?
Our guide range for a major void in Bromley is £7,300–£18,300 per void. That is the UK range of £6,000–£15,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about supported and sheltered housing refurbishment in Bromley
Does the London Borough of Bromley still own council homes?
Most social homes in Bromley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bromley remains the strategic housing authority, with duties on homelessness and housing need.
Which housing standard applies in Bromley?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on supported and sheltered housing refurbishment in Bromley as a subcontractor?
Yes. Main contractors working for social landlords in Bromley can engage us as a tier-2 subcontractor for supported and sheltered housing refurbishment, working under their systems and their client's specification.
Other works we carry out in Bromley
- Housing disrepair works
- Void property works
- Responsive repairs
- Planned maintenance and Decent Homes works
- Bathroom replacement programmes
- Heating upgrades and heat pumps
- Aids and adaptations
- Estate and external works
- Fire door installation and remediation
- Damp and mould remediation
- External wall insulation
- Electrical remedial works and rewires