Whole-house retrofit · London

Whole-house retrofit in Greenwich

If you have a funded retrofit project in Greenwich, we can price the measures, confirm certification arrangements in writing and deliver to programme.

We take on whole-house retrofit in Greenwich for the Royal Borough of Greenwich, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. The Royal Borough of Greenwich still owns about 20,714 council homes here, alongside housing association stock.

Greenwich at a glance

Council
Royal Borough of Greenwich
Region
London
Council homes
Council-owned, managed by the council
Approx. council homes
20,714 (2020)
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
289,034 (2020 estimate)
Regional price factor
1.22 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Greenwich?

The Royal Borough of Greenwich still owns council homes in Greenwich and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 20,714 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

What do we cover in Greenwich?

  • Fabric measures: external, internal and cavity wall insulation, loft and floor insulation
  • Ventilation upgrades to match the improved airtightness
  • Heating: heat pumps, controls and emitters where specified
  • Resident liaison through a disruptive programme
  • Handover data for lodgement and post-installation evaluation
Whole-house retrofit in a social home

How do we deliver it?

Residents get a plain-English guide to their new heating and ventilation at handover. A heat pump that is run like a gas boiler will disappoint everyone.

Which rules apply in Greenwich?

Warm Homes: Social Housing Fund Wave 3 (£1.29bn for 2025–2028, plus up to £295m more for 2026/27) requires delivery under PAS 2035/2030, TrustMark-registered installers and, for heat pumps and solar, MCS certification. The fund is closed to new applications.

Decent Homes Standard (England) · More about whole-house retrofit

What does whole-house retrofit cost in Greenwich?

Our guide range for whole-house retrofit towards EPC C in Greenwich is £16,450–£28,800 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about whole-house retrofit in Greenwich

Does the Royal Borough of Greenwich still own council homes?

The Royal Borough of Greenwich still owns council homes in Greenwich and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 20,714 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

Which housing standard applies in Greenwich?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.

Can you take on whole-house retrofit in Greenwich as a subcontractor?

Yes. Main contractors working for social landlords in Greenwich can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote