Whole-house retrofit · East of England
Whole-house retrofit in Fenland
Retrofit programmes in Fenland work when insulation, airtightness and ventilation are planned together. We install to the design your coordinator signs off.
We take on whole-house retrofit in Fenland for housing associations (which own most social homes here) and supported housing providers, managing every trade ourselves and working to the timescales in your order. Most social homes in Fenland belong to housing associations after the council transferred its stock.
Fenland at a glance
- Council
- Fenland District Council
- Region
- East of England
- County
- Cambridgeshire
- Council homes
- Transferred to housing associations
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 102,080 (2020 estimate)
- Regional price factor
- 1.04 (our estimate)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Fenland?
Most social homes in Fenland are owned by housing associations, following the transfer of the council's homes to housing association ownership. Fenland District Council remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Fenland?
- Coordination with your retrofit assessor and retrofit coordinator
- Windows and doors, draught-proofing and airtightness details
- Ventilation upgrades to match the improved airtightness
- Solar PV where it is part of the design
- Resident liaison through a disruptive programme

How do we deliver it?
We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.
Which rules apply in Fenland?
PAS 2035:2023 sets the whole-house retrofit process (assessment, coordination, design, installation and evaluation), and PAS 2030:2023 covers installation. Most government-backed retrofit schemes require both, with TrustMark lodgement.
Decent Homes Standard (England) · More about whole-house retrofit
What does whole-house retrofit cost in Fenland?
Our guide range for whole-house retrofit towards EPC C in Fenland is £14,050–£24,550 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.04 (our own estimate); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in Fenland
Does Fenland District Council still own council homes?
Most social homes in Fenland are owned by housing associations, following the transfer of the council's homes to housing association ownership. Fenland District Council remains the strategic housing authority, with duties on homelessness and housing need.
Which housing standard applies in Fenland?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on whole-house retrofit in Fenland as a subcontractor?
Yes. Main contractors working for social landlords in Fenland can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.
Other works we carry out in Fenland
- Loft and cavity wall insulation
- Housing disrepair works
- Responsive repairs
- Bathroom replacement programmes
- External wall insulation
- Planned maintenance and Decent Homes works
- Supported and sheltered housing refurbishment
- Electrical remedial works and rewires
- Window and door replacement
- Heating upgrades and heat pumps
- Damp and mould remediation
- Brickwork, pointing and render repairs