Whole-house retrofit · East of England

Whole-house retrofit in East Cambridgeshire

Social landlords in East Cambridgeshire can use us to deliver retrofit measures towards their EPC and net zero targets, with the evidence funders ask for.

Social landlords in East Cambridgeshire can appoint us for whole-house retrofit, from a single home to a programme. Most social homes in East Cambridgeshire belong to housing associations after the council transferred its stock. We work to the Decent Homes Standard and to your own specification.

East Cambridgeshire at a glance

Council
East Cambridgeshire District Council
Region
East of England
County
Cambridgeshire
Council homes
Transferred to housing associations
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
90,172 (2020 estimate)
Regional price factor
1.04 (our estimate)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in East Cambridgeshire?

Most social homes in East Cambridgeshire are owned by housing associations, following the transfer of the council's homes to housing association ownership. East Cambridgeshire District Council remains the strategic housing authority, with duties on homelessness and housing need.

What do we cover in East Cambridgeshire?

  • Coordination with your retrofit assessor and retrofit coordinator
  • Windows and doors, draught-proofing and airtightness details
  • Ventilation upgrades to match the improved airtightness
  • Heating: heat pumps, controls and emitters where specified
  • Solar PV where it is part of the design
Whole-house retrofit in a social home

How do we deliver it?

Residents get a plain-English guide to their new heating and ventilation at handover. A heat pump that is run like a gas boiler will disappoint everyone.

Which rules apply in East Cambridgeshire?

Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.

Decent Homes Standard (England) · More about whole-house retrofit

What does whole-house retrofit cost in East Cambridgeshire?

Our guide range for whole-house retrofit towards EPC C in East Cambridgeshire is £14,050–£24,550 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.04 (our own estimate); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about whole-house retrofit in East Cambridgeshire

Does East Cambridgeshire District Council still own council homes?

Most social homes in East Cambridgeshire are owned by housing associations, following the transfer of the council's homes to housing association ownership. East Cambridgeshire District Council remains the strategic housing authority, with duties on homelessness and housing need.

Which housing standard applies in East Cambridgeshire?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.

Do you also work near East Cambridgeshire?

Yes. We take on whole-house retrofit across the East of England, including Cambridge, West Suffolk, South Cambridgeshire and Fenland, and in every other UK nation.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote