Whole-house retrofit · East Midlands

Whole-house retrofit in South Holland

If you have a funded retrofit project in South Holland, we can price the measures, confirm certification arrangements in writing and deliver to programme.

Social landlords in South Holland can appoint us for whole-house retrofit, from a single home to a programme. South Holland District Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.

South Holland at a glance

Council
South Holland District Council
Region
East Midlands
County
Lincolnshire
Council homes
Council-owned, managed by the council
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
95,857 (2020 estimate)
Regional price factor
1.02 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in South Holland?

South Holland District Council still owns council homes in South Holland and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.

What do we cover in South Holland?

  • Coordination with your retrofit assessor and retrofit coordinator
  • Fabric measures: external, internal and cavity wall insulation, loft and floor insulation
  • Ventilation upgrades to match the improved airtightness
  • Heating: heat pumps, controls and emitters where specified
  • Solar PV where it is part of the design
Whole-house retrofit in a social home

How do we deliver it?

We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.

Which rules apply in South Holland?

Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.

Decent Homes Standard (England) · More about whole-house retrofit

What does whole-house retrofit cost in South Holland?

Our guide range for whole-house retrofit towards EPC C in South Holland is £13,750–£24,050 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about whole-house retrofit in South Holland

Does South Holland District Council still own council homes?

South Holland District Council still owns council homes in South Holland and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.

Which housing standard applies in South Holland?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.

Can you take on whole-house retrofit in South Holland as a subcontractor?

Yes. Main contractors working for social landlords in South Holland can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote