Acquisition and temporary accommodation refurbishment · London
Acquisition and temporary accommodation refurbishment in Hillingdon
We refurbish acquired and leased homes in Hillingdon so they are safe, warm and ready for the households who need them.
We take on acquisition and temporary accommodation refurbishment in Hillingdon for the London Borough of Hillingdon, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. The London Borough of Hillingdon still owns about 10,188 council homes here, alongside housing association stock.
Hillingdon at a glance
- Council
- London Borough of Hillingdon
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 10,188 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 309,014 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Hillingdon?
The London Borough of Hillingdon still owns council homes in Hillingdon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,188 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Hillingdon?
- Condition survey on purchase or lease, with a costed scope
- Electrical and gas safety, alarms and fire safety items
- Damp, mould, ventilation and insulation improvements
- Furnishing coordination where your scheme includes it
- Handover pack with certificates, photos and inventory

How do we deliver it?
Because move-in dates are often fixed by a placement, we programme the work backwards and order long-lead items such as kitchens on approval of the scope.
Which rules apply in Hillingdon?
Since 1 December 2025 (new tenancies) and 1 May 2026 (existing tenancies), social landlords in England must have electrical installations inspected at least every five years and complete remedial work within 28 days, or sooner if the report says so. Electrical equipment the landlord supplies must also be checked at least every five years.
Decent Homes Standard (England) · More about acquisition and temporary accommodation refurbishment
What does acquisition and temporary accommodation refurbishment cost in Hillingdon?
Our guide range for refurbishing an acquired or temporary accommodation home in Hillingdon is £9,750–£30,500 per home. That is the UK range of £8,000–£25,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about acquisition and temporary accommodation refurbishment in Hillingdon
Does the London Borough of Hillingdon still own council homes?
The London Borough of Hillingdon still owns council homes in Hillingdon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,188 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on acquisition and temporary accommodation refurbishment in Hillingdon as a subcontractor?
Yes. Main contractors working for social landlords in Hillingdon can engage us as a tier-2 subcontractor for acquisition and temporary accommodation refurbishment, working under their systems and their client's specification.
Which housing standard applies in Hillingdon?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Hillingdon
- Roofing and rainwater goods
- Kitchen replacement programmes
- Loft and cavity wall insulation
- Heating upgrades and heat pumps
- Estate and external works
- Fire door installation and remediation
- Window and door replacement
- Planned maintenance and Decent Homes works
- Electrical remedial works and rewires
- Fire stopping and compartmentation
- Supported and sheltered housing refurbishment
- Communal area refurbishment