If your investment programme in Hillingdon needs extra delivery capacity, we can take a street, an estate or a component stream.
Planned maintenance works in Hillingdon are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. The London Borough of Hillingdon still owns about 10,188 council homes here, alongside housing association stock.
Hillingdon at a glance
- Council
- London Borough of Hillingdon
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 10,188 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 309,014 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Hillingdon?
The London Borough of Hillingdon still owns council homes in Hillingdon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,188 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Hillingdon?
- Single-component programmes where you prefer separate streams
- Resident liaison and choice management
- Programme reporting: starts, completions, variations and spend
- Updated component data returned for your asset system
- Coordination with your compliance contractors

How do we deliver it?
We start by checking the programme data against what our surveyors find, because ordering components for the wrong homes is the most expensive mistake in planned works.
Which rules apply in Hillingdon?
Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.
Decent Homes Standard (England) · More about planned maintenance works
What do planned maintenance works cost in Hillingdon?
Our guide range for a kitchen in a replacement programme in Hillingdon is £6,100–£12,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about planned maintenance works in Hillingdon
Does the London Borough of Hillingdon still own council homes?
The London Borough of Hillingdon still owns council homes in Hillingdon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,188 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Do you also work near Hillingdon?
Yes. We take on planned maintenance works across London, including Ealing, Harrow, Hounslow and Slough, and in every other UK nation.
Can you take on planned maintenance works in Hillingdon as a subcontractor?
Yes. Main contractors working for social landlords in Hillingdon can engage us as a tier-2 subcontractor for planned maintenance works, working under their systems and their client's specification.
Other works we carry out in Hillingdon
- Cyclical and external decoration
- External wall insulation
- Electrical remedial works and rewires
- Loft and cavity wall insulation
- Brickwork, pointing and render repairs
- Window and door replacement
- Damp and mould remediation
- Kitchen replacement programmes
- Responsive repairs
- Heating upgrades and heat pumps
- Supported and sheltered housing refurbishment
- Housing disrepair works