Planned maintenance and Decent Homes works · London

Planned maintenance and Decent Homes works in Havering

We deliver planned maintenance programmes in Havering from social landlords' stock condition data, as multi-trade packages or single-component streams.

Social landlords in Havering can appoint us for planned maintenance works, from a single home to a programme. The London Borough of Havering still owns about 9,248 council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.

Havering at a glance

Council
London Borough of Havering
Region
London
Council homes
Council-owned, managed by the council
Approx. council homes
9,248 (2020)
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
260,651 (2020 estimate)
Regional price factor
1.22 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Havering?

The London Borough of Havering still owns council homes in Havering and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 9,248 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

What do we cover in Havering?

  • Validation surveys of homes in the programme
  • Multi-trade packages: kitchens, bathrooms, windows, doors, roofs, electrics
  • Single-component programmes where you prefer separate streams
  • Resident liaison and choice management
  • Coordination with your compliance contractors
Planned maintenance and Decent Homes works in a social home

How do we deliver it?

We finish with your asset data updated: what was renewed, when, and the expected life of each new component.

Which rules apply in Havering?

Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.

Decent Homes Standard (England) · More about planned maintenance works

What do planned maintenance works cost in Havering?

Our guide range for a kitchen in a replacement programme in Havering is £6,100–£12,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about planned maintenance works in Havering

Does the London Borough of Havering still own council homes?

The London Borough of Havering still owns council homes in Havering and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 9,248 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

Can you take on planned maintenance works in Havering as a subcontractor?

Yes. Main contractors working for social landlords in Havering can engage us as a tier-2 subcontractor for planned maintenance works, working under their systems and their client's specification.

Do you also work near Havering?

Yes. We take on planned maintenance works across London, including Barking and Dagenham, Redbridge, Brentwood and Thurrock, and in every other UK nation.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote