Planned maintenance and Decent Homes works · London
Planned maintenance and Decent Homes works in Bexley
Asset teams with homes in Bexley can use us to validate, price and deliver planned works, and to return clean data at the end.
Planned maintenance works in Bexley are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. Most social homes in Bexley belong to housing associations after the council transferred its stock.
Bexley at a glance
- Council
- London Borough of Bexley
- Region
- London
- Council homes
- Transferred to housing associations
- Approx. council homes
- 222 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 249,301 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Bexley?
Most social homes in Bexley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bexley remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Bexley?
- Validation surveys of homes in the programme
- Resident liaison and choice management
- Programme reporting: starts, completions, variations and spend
- Updated component data returned for your asset system
- Coordination with your compliance contractors

How do we deliver it?
We finish with your asset data updated: what was renewed, when, and the expected life of each new component.
Which rules apply in Bexley?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Decent Homes Standard (England) · More about planned maintenance works
What do planned maintenance works cost in Bexley?
Our guide range for a kitchen in a replacement programme in Bexley is £6,100–£12,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about planned maintenance works in Bexley
Does the London Borough of Bexley still own council homes?
Most social homes in Bexley are owned by housing associations, following the transfer of the council's homes to housing association ownership. The London Borough of Bexley remains the strategic housing authority, with duties on homelessness and housing need.
Do you also work near Bexley?
Yes. We take on planned maintenance works across London, including Greenwich, Dartford, Barking and Dagenham and Newham, and in every other UK nation.
Which housing standard applies in Bexley?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Bexley
- Bathroom replacement programmes
- Heating upgrades and heat pumps
- Smoke, heat and CO alarm installation
- Acquisition and temporary accommodation refurbishment
- Brickwork, pointing and render repairs
- Loft and cavity wall insulation
- Aids and adaptations
- Whole-house retrofit
- Kitchen replacement programmes
- Housing disrepair works
- Supported and sheltered housing refurbishment
- Electrical remedial works and rewires