We install and repair fire doors in social housing blocks in Islington, with door-by-door evidence for your fire safety records.
We take on fire door installation and remediation in Islington for the London Borough of Islington, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. The London Borough of Islington still owns about 25,303 council homes here, alongside housing association stock.
Islington at a glance
- Council
- London Borough of Islington
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 25,303 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 248,115 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Islington?
The London Borough of Islington still owns council homes in Islington and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 25,303 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Islington?
- Flat entrance doorsets (commonly FD30S) supplied and fitted
- Remedials from inspection reports: gaps, closers, seals, hinges, glazing
- Self-closing devices adjusted or replaced
- Fire door signage and keep-shut notices
- Data for your fire door register

How do we deliver it?
We match our completion log to your inspection report line by line, so your fire door register can be updated without interpretation.
Which rules apply in Islington?
Under the Fire Safety (England) Regulations 2022, in residential buildings with storeys over 11 metres high, communal fire doors must be checked every three months and flat entrance doors every year on a best-endeavours basis. The Fire Safety Act 2021 confirmed that flat entrance doors fall under the Fire Safety Order.
Decent Homes Standard (England) · More about fire door installation and remediation
What does fire door installation and remediation cost in Islington?
Our guide range for a flat entrance fire doorset (FD30S), supplied and fitted in Islington is £2,950–£4,750 per door. That is the UK range of £2,400–£3,900 (derived from published totals) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about fire door installation and remediation in Islington
Does the London Borough of Islington still own council homes?
The London Borough of Islington still owns council homes in Islington and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 25,303 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in Islington?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on fire door installation and remediation in Islington as a subcontractor?
Yes. Main contractors working for social landlords in Islington can engage us as a tier-2 subcontractor for fire door installation and remediation, working under their systems and their client's specification.
Other works we carry out in Islington
- Brickwork, pointing and render repairs
- Cyclical and external decoration
- Whole-house retrofit
- Fire stopping and compartmentation
- Loft and cavity wall insulation
- Acquisition and temporary accommodation refurbishment
- Aids and adaptations
- Damp and mould remediation
- Smoke, heat and CO alarm installation
- Supported and sheltered housing refurbishment
- Planned maintenance and Decent Homes works
- Kitchen replacement programmes