Acquisition and temporary accommodation refurbishment · North West

Acquisition and temporary accommodation refurbishment in Warrington

Acquisition programmes in Warrington need fast, accurate surveys and a contractor who can work to fixed dates. That is what we offer.

Social landlords in Warrington can appoint us for acquisition and temporary accommodation refurbishment, from a single home to a programme. Most social homes in Warrington belong to housing associations after the council transferred its stock. We work to the Decent Homes Standard and to your own specification.

Warrington at a glance

Council
Warrington Borough Council
Region
North West
Council homes
Transferred to housing associations
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
209,397 (2020 estimate)
Regional price factor
1.01 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Warrington?

Most social homes in Warrington are owned by housing associations, following the transfer of the council's homes to housing association ownership. Warrington Borough Council remains the strategic housing authority, with duties on homelessness and housing need.

What do we cover in Warrington?

  • Condition survey on purchase or lease, with a costed scope
  • Kitchens, bathrooms, flooring and decoration to your standard
  • Security: locks, door entry and window restrictors
  • Furnishing coordination where your scheme includes it
  • Handover pack with certificates, photos and inventory
Acquisition and temporary accommodation refurbishment in a social home

How do we deliver it?

An acquired home is an unknown quantity until it is opened up, so our first survey is thorough and our scope lists what we could and could not see.

Which rules apply in Warrington?

Since 1 December 2025 (new tenancies) and 1 May 2026 (existing tenancies), social landlords in England must have electrical installations inspected at least every five years and complete remedial work within 28 days, or sooner if the report says so. Electrical equipment the landlord supplies must also be checked at least every five years.

Decent Homes Standard (England) · More about acquisition and temporary accommodation refurbishment

What does acquisition and temporary accommodation refurbishment cost in Warrington?

Our guide range for refurbishing an acquired or temporary accommodation home in Warrington is £8,100–£25,250 per home. That is the UK range of £8,000–£25,000 (our estimate) adjusted by a regional cost factor of 1.01 (VOA Rating Cost Guide 2026: 1.01–1.02); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about acquisition and temporary accommodation refurbishment in Warrington

Does Warrington Borough Council still own council homes?

Most social homes in Warrington are owned by housing associations, following the transfer of the council's homes to housing association ownership. Warrington Borough Council remains the strategic housing authority, with duties on homelessness and housing need.

Do you also work near Warrington?

Yes. We take on acquisition and temporary accommodation refurbishment across the North West, including Halton, St. Helens, Trafford and Wigan, and in every other UK nation.

Which housing standard applies in Warrington?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote