Acquisition and temporary accommodation refurbishment · London
Acquisition and temporary accommodation refurbishment in Kingston upon Thames
If you are buying or leasing homes in Kingston upon Thames for temporary accommodation, we can turn them round to your standard, one at a time or in batches.
Social landlords in Kingston upon Thames can appoint us for acquisition and temporary accommodation refurbishment, from a single home to a programme. The Royal Borough of Kingston upon Thames still owns about 4,573 council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
Kingston upon Thames at a glance
- Council
- Royal Borough of Kingston upon Thames
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 4,573 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 179,142 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Kingston upon Thames?
The Royal Borough of Kingston upon Thames still owns council homes in Kingston upon Thames and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 4,573 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Kingston upon Thames?
- Condition survey on purchase or lease, with a costed scope
- Kitchens, bathrooms, flooring and decoration to your standard
- Damp, mould, ventilation and insulation improvements
- Security: locks, door entry and window restrictors
- Handover pack with certificates, photos and inventory

How do we deliver it?
Because move-in dates are often fixed by a placement, we programme the work backwards and order long-lead items such as kitchens on approval of the scope.
Which rules apply in Kingston upon Thames?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Decent Homes Standard (England) · More about acquisition and temporary accommodation refurbishment
What does acquisition and temporary accommodation refurbishment cost in Kingston upon Thames?
Our guide range for refurbishing an acquired or temporary accommodation home in Kingston upon Thames is £9,750–£30,500 per home. That is the UK range of £8,000–£25,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about acquisition and temporary accommodation refurbishment in Kingston upon Thames
Does the Royal Borough of Kingston upon Thames still own council homes?
The Royal Borough of Kingston upon Thames still owns council homes in Kingston upon Thames and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 4,573 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on acquisition and temporary accommodation refurbishment in Kingston upon Thames as a subcontractor?
Yes. Main contractors working for social landlords in Kingston upon Thames can engage us as a tier-2 subcontractor for acquisition and temporary accommodation refurbishment, working under their systems and their client's specification.
Which housing standard applies in Kingston upon Thames?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Kingston upon Thames
- Loft and cavity wall insulation
- Fire stopping and compartmentation
- Planned maintenance and Decent Homes works
- Housing disrepair works
- External wall insulation
- Damp and mould remediation
- Whole-house retrofit
- Cyclical and external decoration
- Fire door installation and remediation
- Brickwork, pointing and render repairs
- Aids and adaptations
- Heating upgrades and heat pumps