Acquisition and temporary accommodation refurbishment · London
Acquisition and temporary accommodation refurbishment in Enfield
Acquisition programmes in Enfield need fast, accurate surveys and a contractor who can work to fixed dates. That is what we offer.
Acquisition and temporary accommodation refurbishment in Enfield is carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. The London Borough of Enfield still owns about 10,692 council homes here, alongside housing association stock.
Enfield at a glance
- Council
- London Borough of Enfield
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 10,692 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 333,587 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Enfield?
The London Borough of Enfield still owns council homes in Enfield and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,692 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Enfield?
- Condition survey on purchase or lease, with a costed scope
- Kitchens, bathrooms, flooring and decoration to your standard
- Damp, mould, ventilation and insulation improvements
- Furnishing coordination where your scheme includes it
- Handover pack with certificates, photos and inventory

How do we deliver it?
We hand over with everything your housing officer needs on the first day: certificates, photos, meter readings and keys.
Which rules apply in Enfield?
Since 1 December 2025 (new tenancies) and 1 May 2026 (existing tenancies), social landlords in England must have electrical installations inspected at least every five years and complete remedial work within 28 days, or sooner if the report says so. Electrical equipment the landlord supplies must also be checked at least every five years.
Decent Homes Standard (England) · More about acquisition and temporary accommodation refurbishment
What does acquisition and temporary accommodation refurbishment cost in Enfield?
Our guide range for refurbishing an acquired or temporary accommodation home in Enfield is £9,750–£30,500 per home. That is the UK range of £8,000–£25,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about acquisition and temporary accommodation refurbishment in Enfield
Does the London Borough of Enfield still own council homes?
The London Borough of Enfield still owns council homes in Enfield and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 10,692 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Do you also work near Enfield?
Yes. We take on acquisition and temporary accommodation refurbishment across London, including Haringey, Waltham Forest, Broxbourne and Barnet, and in every other UK nation.
Which housing standard applies in Enfield?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Enfield
- Planned maintenance and Decent Homes works
- Electrical remedial works and rewires
- Heating upgrades and heat pumps
- Cyclical and external decoration
- Kitchen replacement programmes
- Supported and sheltered housing refurbishment
- Window and door replacement
- Responsive repairs
- Housing disrepair works
- Communal area refurbishment
- Estate and external works
- Smoke, heat and CO alarm installation