Acquisition and temporary accommodation refurbishment · London
Acquisition and temporary accommodation refurbishment in Croydon
Councils and housing associations acquiring homes in Croydon can use us to survey, price and refurbish them to a move-in date.
Acquisition and temporary accommodation refurbishment in Croydon is carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. The London Borough of Croydon still owns about 13,418 council homes here, alongside housing association stock.
Croydon at a glance
- Council
- London Borough of Croydon
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 13,418 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 388,563 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Croydon?
The London Borough of Croydon still owns council homes in Croydon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 13,418 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Croydon?
- Electrical and gas safety, alarms and fire safety items
- Kitchens, bathrooms, flooring and decoration to your standard
- Damp, mould, ventilation and insulation improvements
- Furnishing coordination where your scheme includes it
- Handover pack with certificates, photos and inventory

How do we deliver it?
We hand over with everything your housing officer needs on the first day: certificates, photos, meter readings and keys.
Which rules apply in Croydon?
Since 1 December 2025 (new tenancies) and 1 May 2026 (existing tenancies), social landlords in England must have electrical installations inspected at least every five years and complete remedial work within 28 days, or sooner if the report says so. Electrical equipment the landlord supplies must also be checked at least every five years.
Decent Homes Standard (England) · More about acquisition and temporary accommodation refurbishment
What does acquisition and temporary accommodation refurbishment cost in Croydon?
Our guide range for refurbishing an acquired or temporary accommodation home in Croydon is £9,750–£30,500 per home. That is the UK range of £8,000–£25,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about acquisition and temporary accommodation refurbishment in Croydon
Does the London Borough of Croydon still own council homes?
The London Borough of Croydon still owns council homes in Croydon and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 13,418 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Do you also work near Croydon?
Yes. We take on acquisition and temporary accommodation refurbishment across London, including Sutton, Merton, Bromley and Lambeth, and in every other UK nation.
Can you take on acquisition and temporary accommodation refurbishment in Croydon as a subcontractor?
Yes. Main contractors working for social landlords in Croydon can engage us as a tier-2 subcontractor for acquisition and temporary accommodation refurbishment, working under their systems and their client's specification.
Other works we carry out in Croydon
- Damp and mould remediation
- Window and door replacement
- Brickwork, pointing and render repairs
- Fire stopping and compartmentation
- Estate and external works
- Void property works
- Communal area refurbishment
- Cyclical and external decoration
- Electrical remedial works and rewires
- Housing disrepair works
- Roofing and rainwater goods
- Supported and sheltered housing refurbishment