Supported and sheltered housing refurbishment in Haringey
If a scheme in Haringey needs refurbishment, we can phase the works so residents keep the facilities they rely on.
We take on supported and sheltered housing refurbishment in Haringey for the London Borough of Haringey, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. The London Borough of Haringey still owns about 15,106 council homes here, alongside housing association stock.
Haringey at a glance
- Council
- London Borough of Haringey
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 15,106 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 266,357 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Haringey?
The London Borough of Haringey still owns council homes in Haringey and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 15,106 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Haringey?
- Communal lounges, kitchens and laundries
- Corridors, handrails, flooring and lighting for accessibility
- Accessible bathrooms and level-access showers
- Coordination with warden-call and alarm system providers
- Fire safety items in communal areas

How do we deliver it?
Before work starts, we agree a plan with the scheme manager: working hours, quiet times, routes and how we will communicate with residents.
Which rules apply in Haringey?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Decent Homes Standard (England) · More about supported and sheltered housing refurbishment
What does supported and sheltered housing refurbishment cost in Haringey?
Our guide range for a major void in Haringey is £7,300–£18,300 per void. That is the UK range of £6,000–£15,000 (our estimate) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about supported and sheltered housing refurbishment in Haringey
Does the London Borough of Haringey still own council homes?
The London Borough of Haringey still owns council homes in Haringey and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 15,106 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on supported and sheltered housing refurbishment in Haringey as a subcontractor?
Yes. Main contractors working for social landlords in Haringey can engage us as a tier-2 subcontractor for supported and sheltered housing refurbishment, working under their systems and their client's specification.
Do you also work near Haringey?
Yes. We take on supported and sheltered housing refurbishment across London, including Islington, Hackney, Camden and Waltham Forest, and in every other UK nation.
Other works we carry out in Haringey
- Void property works
- Housing disrepair works
- Smoke, heat and CO alarm installation
- Heating upgrades and heat pumps
- Brickwork, pointing and render repairs
- Damp and mould remediation
- Acquisition and temporary accommodation refurbishment
- Communal area refurbishment
- Fire door installation and remediation
- Kitchen replacement programmes
- Whole-house retrofit
- Window and door replacement