Housing disrepair works · East of England
Housing disrepair works in Basildon
When a disrepair case in Basildon reaches the works stage, the quality of your evidence matters as much as the repair. We provide both.
Housing disrepair works in Basildon are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. Basildon Borough Council still owns council homes here, alongside housing association stock.
Basildon at a glance
- Council
- Basildon Borough Council
- Region
- East of England
- County
- Essex
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 187,558 (2020 estimate)
- Regional price factor
- 1.04 (our estimate)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Basildon?
Basildon Borough Council still owns council homes in Basildon and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Basildon?
- Works to an agreed schedule from your surveyor or a joint expert
- Damp, mould and leak remediation, including the causes
- Plaster, joinery, windows, doors and roof repairs
- Temporary measures where works cannot start at once
- Tenant liaison and evidenced access attempts

How do we deliver it?
Where the schedule treats a symptom, such as mould on a wall, we point out the likely cause and price the fix separately, so you can decide whether to deal with it now.
Which rules apply in Basildon?
In England, housing conditions claims follow the Pre-Action Protocol for Housing Conditions Claims: the landlord responds to a letter of claim within 20 working days with a schedule of works, and any expert inspection follows within 20 working days of that response. The Housing Ombudsman's Complaint Handling Code has been statutory since April 2024.
Decent Homes Standard (England) · More about housing disrepair works
What do housing disrepair works cost in Basildon?
Our guide range for a disrepair schedule of works in Basildon is £1,550–£8,300 per case. That is the UK range of £1,500–£8,000 (our estimate) adjusted by a regional cost factor of 1.04 (our own estimate); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about housing disrepair works in Basildon
Does Basildon Borough Council still own council homes?
Basildon Borough Council still owns council homes in Basildon and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which damp and mould rules apply in Basildon?
Awaab's Law timescales for damp and mould and emergency hazards have applied to social landlords in England since 27 October 2025, with phase 2 extending them to more hazards from 30 November 2026.
Can you take on housing disrepair works in Basildon as a subcontractor?
Yes. Main contractors working for social landlords in Basildon can engage us as a tier-2 subcontractor for housing disrepair works, working under their systems and their client's specification.
Other works we carry out in Basildon
- Kitchen replacement programmes
- Fire stopping and compartmentation
- Responsive repairs
- Whole-house retrofit
- Supported and sheltered housing refurbishment
- Heating upgrades and heat pumps
- Acquisition and temporary accommodation refurbishment
- Fire door installation and remediation
- Void property works
- Window and door replacement
- Loft and cavity wall insulation
- Brickwork, pointing and render repairs