Fire stopping and compartmentation · London
Fire stopping and compartmentation in Tower Hamlets
If your blocks in Tower Hamlets need fire stopping remedials, we can survey, specify tested systems and complete the work to the manufacturer's details.
Fire stopping and compartmentation works in Tower Hamlets are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. The London Borough of Tower Hamlets still owns about 11,477 council homes here, alongside housing association stock.
Tower Hamlets at a glance
- Council
- London Borough of Tower Hamlets
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 11,477 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 331,969 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Tower Hamlets?
The London Borough of Tower Hamlets still owns council homes in Tower Hamlets and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 11,477 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Tower Hamlets?
- Compartmentation surveys of risers, ceiling voids and roof spaces
- Sealing service penetrations with tested systems
- Cavity barriers and fire-rated batt systems
- Fire-rated boarding and ceiling repairs
- Penetration logs with photographs and product references

How do we deliver it?
We match the system to the penetration: plastic pipes, metal pipes and cable bundles each need a different tested solution.
Which rules apply in Tower Hamlets?
Under the Building Safety Act 2022, building work in higher-risk buildings (18 metres or 7 storeys and above, with at least two homes) needs Building Safety Regulator approval before it starts unless it is exempt; most repairs and like-for-like replacements are exempt, but heating systems, fuse boxes and glazing units are not. Approval can take up to eight weeks for existing buildings, so we build it into the programme.
Decent Homes Standard (England) · More about fire stopping and compartmentation works
What do fire stopping and compartmentation works cost in Tower Hamlets?
We price fire stopping and compartmentation works in Tower Hamlets after a survey rather than from a guide range, because the number and type of penetrations, access to risers and voids, and building height vary from block to block. Send us the details and we will arrange a visit.
Questions about fire stopping and compartmentation works in Tower Hamlets
Does the London Borough of Tower Hamlets still own council homes?
The London Borough of Tower Hamlets still owns council homes in Tower Hamlets and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 11,477 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Do you also work near Tower Hamlets?
Yes. We take on fire stopping and compartmentation works across London, including the City of London, Hackney, Newham and Southwark, and in every other UK nation.
Which housing standard applies in Tower Hamlets?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Tower Hamlets
- Aids and adaptations
- Housing disrepair works
- Cyclical and external decoration
- Window and door replacement
- Electrical remedial works and rewires
- Smoke, heat and CO alarm installation
- Responsive repairs
- Estate and external works
- Bathroom replacement programmes
- Heating upgrades and heat pumps
- Whole-house retrofit
- Acquisition and temporary accommodation refurbishment