Electrical remedial works and rewires · East Midlands
Electrical remedial works and rewires in Lincoln
EICR programmes in Lincoln produce remedial lists. We close them out item by item and give you the certificates.
Electrical remedial works and rewires in Lincoln are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. City of Lincoln Council still owns council homes here, alongside housing association stock.
Lincoln at a glance
- Council
- City of Lincoln Council
- Region
- East Midlands
- County
- Lincolnshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 100,049 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Lincoln?
City of Lincoln Council still owns council homes in Lincoln and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Lincoln?
- C1, C2 and FI remedial works from EICRs
- Full and partial rewires in occupied homes
- Additional circuits and sockets
- Mains-wired alarms in coordination with alarm upgrades
- Certification and Building Regulations notification

How do we deliver it?
We close out each EICR item by reference, so your compliance system shows exactly which defects have been cleared and which are outstanding.
Which rules apply in Lincoln?
Since 1 December 2025 (new tenancies) and 1 May 2026 (existing tenancies), social landlords in England must have electrical installations inspected at least every five years and complete remedial work within 28 days, or sooner if the report says so. Electrical equipment the landlord supplies must also be checked at least every five years.
Decent Homes Standard (England) · More about electrical remedial works and rewires
What do electrical remedial works and rewires cost in Lincoln?
Our guide range for an EICR with Category 1 and 2 remedials in Lincoln is around £950 per home. That is the UK range of around £930 (derived from published totals) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about electrical remedial works and rewires in Lincoln
Does City of Lincoln Council still own council homes?
City of Lincoln Council still owns council homes in Lincoln and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in Lincoln?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Do you also work near Lincoln?
Yes. We take on electrical remedial works and rewires across the East Midlands, including North Kesteven, West Lindsey, Newark and Sherwood and Bassetlaw, and in every other UK nation.
Other works we carry out in Lincoln
- Heating upgrades and heat pumps
- Communal area refurbishment
- Loft and cavity wall insulation
- Void property works
- Window and door replacement
- Aids and adaptations
- Cyclical and external decoration
- Supported and sheltered housing refurbishment
- Housing disrepair works
- Whole-house retrofit
- Kitchen replacement programmes
- External wall insulation