Whole-house retrofit · Wales
Whole-house retrofit in Newport
If you have a funded retrofit project in Newport, we can price the measures, confirm certification arrangements in writing and deliver to programme.
Social landlords in Newport can appoint us for whole-house retrofit, from a single home to a programme. Most social homes in Newport belong to housing associations after the council transferred its stock. We work to the Welsh Housing Quality Standard 2023 and to your own specification.
Newport at a glance
- Council
- Newport City Council
- Nation
- Wales
- Council homes
- Transferred to housing associations
- Housing standard
- WHQS 2023 (Wales)
- Damp and mould timescales
- No timescale law found
- Population
- 156,447 (2020 estimate)
- Regional price factor
- 0.93 (VOA 2026)
Council housing status from published stock transfer histories (11 transfer and 11 stock-retaining councils), not yet checked against StatsWales tables. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Newport?
Most social homes in Newport are owned by housing associations, following the transfer of the council's homes to housing association ownership. Eleven of Wales's 22 councils took this route. Newport City Council remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Newport?
- Windows and doors, draught-proofing and airtightness details
- Heating: heat pumps, controls and emitters where specified
- Solar PV where it is part of the design
- Resident liaison through a disruptive programme
- Handover data for lodgement and post-installation evaluation

How do we deliver it?
We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.
Which rules apply in Newport?
Replacement windows, heating systems and some electrical work are controlled under the Building Regulations in Wales, and are self-certified by a competent person scheme installer or approved by building control.
WHQS 2023 (Wales) · More about whole-house retrofit
What does whole-house retrofit cost in Newport?
Our guide range for whole-house retrofit towards EPC C in Newport is £12,550–£21,950 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 0.93 (VOA Rating Cost Guide 2026: 0.88–0.98); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in Newport
Does Newport City Council still own council homes?
Most social homes in Newport are owned by housing associations, following the transfer of the council's homes to housing association ownership. Eleven of Wales's 22 councils took this route. Newport City Council remains the strategic housing authority, with duties on homelessness and housing need.
Which housing standard applies in Newport?
Social landlords in Wales work to the Welsh Housing Quality Standard 2023, which has applied since 1 April 2024, with all homes to comply by 31 March 2034.
Do you also work near Newport?
Yes. We take on whole-house retrofit across Wales, including Torfaen, Cardiff, Caerphilly and Monmouthshire, and in every other UK nation.
Other works we carry out in Newport
- Electrical remedial works and rewires
- Brickwork, pointing and render repairs
- Smoke, heat and CO alarm installation
- Acquisition and temporary accommodation refurbishment
- Bathroom replacement programmes
- Supported and sheltered housing refurbishment
- Housing disrepair works
- Cyclical and external decoration
- Damp and mould remediation
- Heating upgrades and heat pumps
- Loft and cavity wall insulation
- Fire door installation and remediation