Whole-house retrofit · London

Whole-house retrofit in Hackney

If you have a funded retrofit project in Hackney, we can price the measures, confirm certification arrangements in writing and deliver to programme.

We take on whole-house retrofit in Hackney for the London Borough of Hackney, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. The London Borough of Hackney still owns about 21,841 council homes here, alongside housing association stock.

Hackney at a glance

Council
London Borough of Hackney
Region
London
Council homes
Council-owned, managed by the council
Approx. council homes
21,841 (2020)
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
280,941 (2020 estimate)
Regional price factor
1.22 (VOA 2026)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Hackney?

The London Borough of Hackney still owns council homes in Hackney and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 21,841 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

What do we cover in Hackney?

  • Fabric measures: external, internal and cavity wall insulation, loft and floor insulation
  • Windows and doors, draught-proofing and airtightness details
  • Ventilation upgrades to match the improved airtightness
  • Solar PV where it is part of the design
  • Handover data for lodgement and post-installation evaluation
Whole-house retrofit in a social home

How do we deliver it?

We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.

Which rules apply in Hackney?

PAS 2035:2023 sets the whole-house retrofit process (assessment, coordination, design, installation and evaluation), and PAS 2030:2023 covers installation. Most government-backed retrofit schemes require both, with TrustMark lodgement.

Decent Homes Standard (England) · More about whole-house retrofit

What does whole-house retrofit cost in Hackney?

Our guide range for whole-house retrofit towards EPC C in Hackney is £16,450–£28,800 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about whole-house retrofit in Hackney

Does the London Borough of Hackney still own council homes?

The London Borough of Hackney still owns council homes in Hackney and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 21,841 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.

Can you take on whole-house retrofit in Hackney as a subcontractor?

Yes. Main contractors working for social landlords in Hackney can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.

Do you also work near Hackney?

Yes. We take on whole-house retrofit across London, including Islington, Tower Hamlets, the City of London and Haringey, and in every other UK nation.

Talk to us

Need extra delivery capacity for your homes?

Send us your order, schedule or programme and we will come back with a clear scope, a price and a realistic start date.

Call usRequest a quote