Whole-house retrofit · East of England
Whole-house retrofit in Castle Point
If you have a funded retrofit project in Castle Point, we can price the measures, confirm certification arrangements in writing and deliver to programme.
We take on whole-house retrofit in Castle Point for Castle Point Borough Council, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. Castle Point Borough Council still owns council homes here, alongside housing association stock.
Castle Point at a glance
- Council
- Castle Point Borough Council
- Region
- East of England
- County
- Essex
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 90,524 (2020 estimate)
- Regional price factor
- 1.04 (our estimate)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Castle Point?
Castle Point Borough Council still owns council homes in Castle Point and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Castle Point?
- Coordination with your retrofit assessor and retrofit coordinator
- Fabric measures: external, internal and cavity wall insulation, loft and floor insulation
- Ventilation upgrades to match the improved airtightness
- Solar PV where it is part of the design
- Handover data for lodgement and post-installation evaluation

How do we deliver it?
We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.
Which rules apply in Castle Point?
PAS 2035:2023 sets the whole-house retrofit process (assessment, coordination, design, installation and evaluation), and PAS 2030:2023 covers installation. Most government-backed retrofit schemes require both, with TrustMark lodgement.
Decent Homes Standard (England) · More about whole-house retrofit
What does whole-house retrofit cost in Castle Point?
Our guide range for whole-house retrofit towards EPC C in Castle Point is £14,050–£24,550 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.04 (our own estimate); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in Castle Point
Does Castle Point Borough Council still own council homes?
Castle Point Borough Council still owns council homes in Castle Point and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in Castle Point?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on whole-house retrofit in Castle Point as a subcontractor?
Yes. Main contractors working for social landlords in Castle Point can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.
Other works we carry out in Castle Point
- Supported and sheltered housing refurbishment
- Damp and mould remediation
- Estate and external works
- Bathroom replacement programmes
- Responsive repairs
- Electrical remedial works and rewires
- Fire door installation and remediation
- External wall insulation
- Brickwork, pointing and render repairs
- Fire stopping and compartmentation
- Window and door replacement
- Roofing and rainwater goods