Whole-house retrofit · East Midlands
Whole-house retrofit in North Northamptonshire
We deliver whole-house retrofit works on social homes in North Northamptonshire, sequenced fabric first and coordinated with your retrofit assessor and coordinator.
Social landlords in North Northamptonshire can appoint us for whole-house retrofit, from a single home to a programme. North Northamptonshire Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
North Northamptonshire at a glance
- Council
- North Northamptonshire Council
- Region
- East Midlands
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 350,448 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in North Northamptonshire?
North Northamptonshire Council still owns council homes in North Northamptonshire and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in North Northamptonshire?
- Coordination with your retrofit assessor and retrofit coordinator
- Fabric measures: external, internal and cavity wall insulation, loft and floor insulation
- Heating: heat pumps, controls and emitters where specified
- Resident liaison through a disruptive programme
- Handover data for lodgement and post-installation evaluation

How do we deliver it?
Residents get a plain-English guide to their new heating and ventilation at handover. A heat pump that is run like a gas boiler will disappoint everyone.
Which rules apply in North Northamptonshire?
Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.
Decent Homes Standard (England) · More about whole-house retrofit
What does whole-house retrofit cost in North Northamptonshire?
Our guide range for whole-house retrofit towards EPC C in North Northamptonshire is £13,750–£24,050 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in North Northamptonshire
Does North Northamptonshire Council still own council homes?
North Northamptonshire Council still owns council homes in North Northamptonshire and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on whole-house retrofit in North Northamptonshire as a subcontractor?
Yes. Main contractors working for social landlords in North Northamptonshire can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.
Which housing standard applies in North Northamptonshire?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in North Northamptonshire
- Damp and mould remediation
- Housing disrepair works
- Loft and cavity wall insulation
- Brickwork, pointing and render repairs
- Heating upgrades and heat pumps
- Aids and adaptations
- Planned maintenance and Decent Homes works
- Fire stopping and compartmentation
- Communal area refurbishment
- Supported and sheltered housing refurbishment
- Window and door replacement
- Acquisition and temporary accommodation refurbishment