Planned maintenance and Decent Homes works · Yorkshire and the Humber
Planned maintenance and Decent Homes works in Rotherham
We deliver planned maintenance programmes in Rotherham from social landlords' stock condition data, as multi-trade packages or single-component streams.
We take on planned maintenance works in Rotherham for Rotherham Metropolitan Borough Council, housing associations and supported housing providers, managing every trade ourselves and working to the timescales in your order. Rotherham Metropolitan Borough Council still owns council homes here, alongside housing association stock.
Rotherham at a glance
- Council
- Rotherham Metropolitan Borough Council
- Region
- Yorkshire and the Humber
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 264,984 (2020 estimate)
- Regional price factor
- 0.92 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Rotherham?
Rotherham Metropolitan Borough Council still owns council homes in Rotherham and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Rotherham?
- Validation surveys of homes in the programme
- Multi-trade packages: kitchens, bathrooms, windows, doors, roofs, electrics
- Single-component programmes where you prefer separate streams
- Resident liaison and choice management
- Coordination with your compliance contractors

How do we deliver it?
Programmes are planned street by street, so each resident sees one coordinated set of works rather than several contractors on different dates.
Which rules apply in Rotherham?
Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.
Decent Homes Standard (England) · More about planned maintenance works
What do planned maintenance works cost in Rotherham?
Our guide range for a kitchen in a replacement programme in Rotherham is £4,600–£9,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 0.92 (VOA Rating Cost Guide 2026: 0.90–0.96); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about planned maintenance works in Rotherham
Does Rotherham Metropolitan Borough Council still own council homes?
Rotherham Metropolitan Borough Council still owns council homes in Rotherham and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in Rotherham?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on planned maintenance works in Rotherham as a subcontractor?
Yes. Main contractors working for social landlords in Rotherham can engage us as a tier-2 subcontractor for planned maintenance works, working under their systems and their client's specification.
Other works we carry out in Rotherham
- Electrical remedial works and rewires
- Responsive repairs
- Roofing and rainwater goods
- Communal area refurbishment
- Damp and mould remediation
- Kitchen replacement programmes
- Cyclical and external decoration
- Whole-house retrofit
- Brickwork, pointing and render repairs
- Bathroom replacement programmes
- Housing disrepair works
- Supported and sheltered housing refurbishment