Planned maintenance and Decent Homes works · South West

Planned maintenance and Decent Homes works in Swindon

We deliver planned maintenance programmes in Swindon from social landlords' stock condition data, as multi-trade packages or single-component streams.

Planned maintenance works in Swindon are carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. Swindon Borough Council still owns council homes here, alongside housing association stock.

Swindon at a glance

Council
Swindon Borough Council
Region
South West
Council homes
Council-owned, managed by the council
Housing standard
Decent Homes Standard (England)
Damp and mould timescales
Awaab's Law (since 27 Oct 2025)
Population
222,881 (2020 estimate)
Regional price factor
1.02 (our estimate)

Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.

Who owns the social homes in Swindon?

Swindon Borough Council still owns council homes in Swindon and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.

What do we cover in Swindon?

  • Validation surveys of homes in the programme
  • Multi-trade packages: kitchens, bathrooms, windows, doors, roofs, electrics
  • Resident liaison and choice management
  • Updated component data returned for your asset system
  • Coordination with your compliance contractors
Planned maintenance and Decent Homes works in a social home

How do we deliver it?

Programmes are planned street by street, so each resident sees one coordinated set of works rather than several contractors on different dates.

Which rules apply in Swindon?

Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.

Decent Homes Standard (England) · More about planned maintenance works

What do planned maintenance works cost in Swindon?

Our guide range for a kitchen in a replacement programme in Swindon is £5,100–£10,200 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 1.02 (our own estimate); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.

Questions about planned maintenance works in Swindon

Does Swindon Borough Council still own council homes?

Swindon Borough Council still owns council homes in Swindon and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.

Do you also work near Swindon?

Yes. We take on planned maintenance works across the South West, including the Vale of White Horse, Cotswold, West Berkshire and Wiltshire, and in every other UK nation.

Which housing standard applies in Swindon?

Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.