Kitchen replacement programmes · Wales
Kitchen replacement programmes in Rhondda Cynon Taf
If kitchens in Rhondda Cynon Taf are due for renewal under your housing quality standard, we can survey, price and install them home by home.
We take on kitchen replacement in Rhondda Cynon Taf for housing associations (which own most social homes here) and supported housing providers, managing every trade ourselves and working to the timescales in your order. Most social homes in Rhondda Cynon Taf belong to housing associations after the council transferred its stock.
Rhondda Cynon Taf at a glance
- Council
- Rhondda Cynon Taf County Borough Council
- Nation
- Wales
- Council homes
- Transferred to housing associations
- Housing standard
- WHQS 2023 (Wales)
- Damp and mould timescales
- No timescale law found
- Population
- 241,873 (2020 estimate)
- Regional price factor
- 0.93 (VOA 2026)
Council housing status from published stock transfer histories (11 transfer and 11 stock-retaining councils), not yet checked against StatsWales tables. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Rhondda Cynon Taf?
Most social homes in Rhondda Cynon Taf are owned by housing associations, following the transfer of the council's homes to housing association ownership. Eleven of Wales's 22 councils took this route. Rhondda Cynon Taf County Borough Council remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Rhondda Cynon Taf?
- Strip-out, asbestos checks and waste removal
- Electrical work to current regulations, with certification
- Plumbing, waste and gas connections (gas work by Gas Safe registered engineers, confirmed in writing before appointment)
- Flooring, making good and decoration
- Resident liaison and temporary cooking facilities where needed

How do we deliver it?
Trades are sequenced by a site supervisor so that strip-out, first fix and second fix follow each other without gaps, which is how a kitchen stays within its planned days.
Which rules apply in Rhondda Cynon Taf?
Gas work done for payment must be carried out by a member of the Gas Safe Register (Gas Safety (Installation and Use) Regulations 1998). Landlords must have each gas appliance and flue checked at least every 12 months and give the record to the tenant within 28 days.
WHQS 2023 (Wales) · More about kitchen replacement
What does kitchen replacement cost in Rhondda Cynon Taf?
Our guide range for a kitchen in a replacement programme in Rhondda Cynon Taf is £4,650–£9,300 per kitchen. That is the UK range of £5,000–£10,000 (derived from published totals) adjusted by a regional cost factor of 0.93 (VOA Rating Cost Guide 2026: 0.88–0.98); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about kitchen replacement in Rhondda Cynon Taf
Does Rhondda Cynon Taf County Borough Council still own council homes?
Most social homes in Rhondda Cynon Taf are owned by housing associations, following the transfer of the council's homes to housing association ownership. Eleven of Wales's 22 councils took this route. Rhondda Cynon Taf County Borough Council remains the strategic housing authority, with duties on homelessness and housing need.
Which housing standard applies in Rhondda Cynon Taf?
Social landlords in Wales work to the Welsh Housing Quality Standard 2023, which has applied since 1 April 2024, with all homes to comply by 31 March 2034.
Can you take on kitchen replacement in Rhondda Cynon Taf as a subcontractor?
Yes. Main contractors working for social landlords in Rhondda Cynon Taf can engage us as a tier-2 subcontractor for kitchen replacement, working under their systems and their client's specification.
Other works we carry out in Rhondda Cynon Taf
- Fire door installation and remediation
- Void property works
- Fire stopping and compartmentation
- Roofing and rainwater goods
- Bathroom replacement programmes
- Aids and adaptations
- Window and door replacement
- Acquisition and temporary accommodation refurbishment
- Loft and cavity wall insulation
- Communal area refurbishment
- Whole-house retrofit
- Estate and external works