Cyclical and external decoration · London
Cyclical and external decoration in Haringey
We carry out cyclical and external decoration in Haringey for social landlords, repairing timber, render and metalwork before painting.
Cyclical decoration in Haringey is carried out by our site teams and specialist subcontractors under our management, with photographs, notes and certificates on every job. The London Borough of Haringey still owns about 15,106 council homes here, alongside housing association stock.
Haringey at a glance
- Council
- London Borough of Haringey
- Region
- London
- Council homes
- Council-owned, managed by the council
- Approx. council homes
- 15,106 (2020)
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 266,357 (2020 estimate)
- Regional price factor
- 1.22 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Haringey?
The London Borough of Haringey still owns council homes in Haringey and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 15,106 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Haringey?
- Pre-paint survey and repairs to timber, render and metalwork
- External decoration of windows, doors, fascias, soffits and render
- Communal internal decoration of halls, stairs and landings
- Gutter clearance during access
- Resident notices and protection

How do we deliver it?
While we have access, we check gutters, fascias and roofs and report anything that needs attention.
Which rules apply in Haringey?
Social landlords are commercial clients under the Construction (Design and Management) Regulations 2015, so the full client duties apply. Where there is more than one contractor, the client appoints a principal designer and a principal contractor.
Decent Homes Standard (England) · More about cyclical decoration
What does cyclical decoration cost in Haringey?
Our guide range for external redecoration of a house in Haringey is £1,000–£4,400 per house. That is the UK range of £800–£3,600 (published figure) adjusted by a regional cost factor of 1.22 (VOA Rating Cost Guide 2026: inner London 1.17–1.32, outer London 1.08–1.26); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about cyclical decoration in Haringey
Does the London Borough of Haringey still own council homes?
The London Borough of Haringey still owns council homes in Haringey and manages them directly, funded through its Housing Revenue Account. The latest published figure we found is about 15,106 council homes (2020). Housing associations also own and manage social homes in the area, and we can work for both.
Which housing standard applies in Haringey?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on cyclical decoration in Haringey as a subcontractor?
Yes. Main contractors working for social landlords in Haringey can engage us as a tier-2 subcontractor for cyclical decoration, working under their systems and their client's specification.
Other works we carry out in Haringey
- Housing disrepair works
- Fire door installation and remediation
- Aids and adaptations
- Brickwork, pointing and render repairs
- Estate and external works
- Kitchen replacement programmes
- Acquisition and temporary accommodation refurbishment
- Window and door replacement
- Roofing and rainwater goods
- Damp and mould remediation
- External wall insulation
- Responsive repairs