If you have a list of adaptations waiting in Gedling, we can price them in the format your funding route requires and work through them.
We take on aids and adaptations in Gedling for housing associations (which own most social homes here) and supported housing providers, managing every trade ourselves and working to the timescales in your order. Most social homes in Gedling belong to housing associations after the council transferred its stock.
Gedling at a glance
- Council
- Gedling Borough Council
- Region
- East Midlands
- County
- Nottinghamshire
- Council homes
- Transferred to housing associations
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 118,239 (2020 estimate)
- Regional price factor
- 1.02 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Gedling?
Most social homes in Gedling are owned by housing associations, following the transfer of the council's homes to housing association ownership. Gedling Borough Council remains the strategic housing authority, with duties on homelessness and housing need.
What do we cover in Gedling?
- Grab rails, stair rails and lever taps
- Ramps, steps and handrails
- Level-access showers and wet rooms
- Kitchen adaptations at accessible heights
- Ground-floor bedroom and shower room extensions

How do we deliver it?
Our prices are itemised in the format your funding route requires, which saves time when claims are made.
Which rules apply in Gedling?
Replacement windows, heating systems and some electrical work are controlled under the Building Regulations. In higher-risk buildings (18 metres or 7 storeys and above, with two or more homes), building work needs Building Safety Regulator approval before it starts unless it is exempt.
Decent Homes Standard (England) · More about aids and adaptations
What do aids and adaptations cost in Gedling?
Our guide range for a level-access shower or wet room in Gedling is £4,850–£6,650 per home. That is the UK range of £4,750–£6,500 (published figure) adjusted by a regional cost factor of 1.02 (VOA Rating Cost Guide 2026: 1.01–1.07); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about aids and adaptations in Gedling
Does Gedling Borough Council still own council homes?
Most social homes in Gedling are owned by housing associations, following the transfer of the council's homes to housing association ownership. Gedling Borough Council remains the strategic housing authority, with duties on homelessness and housing need.
Which housing standard applies in Gedling?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Can you take on aids and adaptations in Gedling as a subcontractor?
Yes. Main contractors working for social landlords in Gedling can engage us as a tier-2 subcontractor for aids and adaptations, working under their systems and their client's specification.
Other works we carry out in Gedling
- Void property works
- Loft and cavity wall insulation
- Kitchen replacement programmes
- Planned maintenance and Decent Homes works
- Estate and external works
- Heating upgrades and heat pumps
- Fire stopping and compartmentation
- Acquisition and temporary accommodation refurbishment
- Damp and mould remediation
- Housing disrepair works
- Window and door replacement
- Brickwork, pointing and render repairs