Whole-house retrofit · West Midlands
Whole-house retrofit in Warwick
Retrofit programmes in Warwick work when insulation, airtightness and ventilation are planned together. We install to the design your coordinator signs off.
Social landlords in Warwick can appoint us for whole-house retrofit, from a single home to a programme. Warwick District Council still owns council homes here, alongside housing association stock. We work to the Decent Homes Standard and to your own specification.
Warwick at a glance
- Council
- Warwick District Council
- Region
- West Midlands
- County
- Warwickshire
- Council homes
- Council-owned, managed by the council
- Housing standard
- Decent Homes Standard (England)
- Damp and mould timescales
- Awaab's Law (since 27 Oct 2025)
- Population
- 144,909 (2020 estimate)
- Regional price factor
- 0.97 (VOA 2026)
Council housing status from Housing Revenue Account records (MHCLG and the 2012 HRA list, updated for later transfers) and council publications, checked October 2026. Population: ONS 2020 mid-year estimate.
Who owns the social homes in Warwick?
Warwick District Council still owns council homes in Warwick and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
What do we cover in Warwick?
- Coordination with your retrofit assessor and retrofit coordinator
- Windows and doors, draught-proofing and airtightness details
- Ventilation upgrades to match the improved airtightness
- Heating: heat pumps, controls and emitters where specified
- Resident liaison through a disruptive programme

How do we deliver it?
We do not treat a measure in isolation. If the design adds insulation and airtightness, we make sure the ventilation upgrade is in the same programme, because condensation is the most common retrofit failure.
Which rules apply in Warwick?
PAS 2035:2023 sets the whole-house retrofit process (assessment, coordination, design, installation and evaluation), and PAS 2030:2023 covers installation. Most government-backed retrofit schemes require both, with TrustMark lodgement.
Decent Homes Standard (England) · More about whole-house retrofit
What does whole-house retrofit cost in Warwick?
Our guide range for whole-house retrofit towards EPC C in Warwick is £13,100–£22,900 per home. That is the UK range of £13,500–£23,600 (published figure) adjusted by a regional cost factor of 0.97 (VOA Rating Cost Guide 2026: 0.95–1.00); figures are before VAT where the source states it. Every job is priced after survey; specification, access and the condition of the homes will move the figure.
Questions about whole-house retrofit in Warwick
Does Warwick District Council still own council homes?
Warwick District Council still owns council homes in Warwick and manages them directly, funded through its Housing Revenue Account. Housing associations also own and manage social homes in the area, and we can work for both.
Can you take on whole-house retrofit in Warwick as a subcontractor?
Yes. Main contractors working for social landlords in Warwick can engage us as a tier-2 subcontractor for whole-house retrofit, working under their systems and their client's specification.
Which housing standard applies in Warwick?
Social homes in England must meet the Decent Homes Standard, enforced through the Regulator of Social Housing's Safety and Quality Standard. A reformed standard, confirmed in January 2026, must be met by 2035 at the latest.
Other works we carry out in Warwick
- Aids and adaptations
- Roofing and rainwater goods
- Cyclical and external decoration
- Electrical remedial works and rewires
- Housing disrepair works
- Supported and sheltered housing refurbishment
- Fire door installation and remediation
- Communal area refurbishment
- Acquisition and temporary accommodation refurbishment
- Loft and cavity wall insulation
- Heating upgrades and heat pumps
- Estate and external works